Interior Painting

Last updated: 2026-10-01

Prep

Patching, sanding, caulking, and priming. Prep is the biggest part of a good result.

Sheen by room

  • Ceilings: flat/matte
  • Walls: eggshell or satin
  • Kitchen/bath: satin or semi-gloss (washable)
  • Trim and doors: semi-gloss

Paint grades and VOC

Use contractor or premium lines. Low- and zero-VOC paints reduce odor and emissions, important indoors.

Coats and color changes

Two coats are typical. Dark-to-light or light-to-dark changes may need primer. Plan for cure time.

Trim, doors, and ceilings

Cut in first, then roll. Popcorn ceilings may contain asbestos; test before scraping in pre-1980 homes.

Ventilation and cure times

Ventilate during and after. Paint is dry to touch in hours but fully cures over 2-4 weeks.

Homeowner checklist

  • Confirm scope and prep in writing
  • Verify brand, line, coats, and sheen
  • Ask about lead if pre-1978
  • Plan where you'll live during the job

We use cookies to understand site traffic. See our Privacy Policy.